The article is dealt with the issues of efficiency and constructive solutions to nodes and elements of the lining objects of tunnel type in complicated geological conditions. A construction of the lining from the universal yielding blocks of uniform size is offered. Reaching pliable layer and methods of calculating of the veering capacity of a two-layer lining arched and circular shapes are recommended.
THE FLEXIBLE TUNNEL LINING IN DIFFICULT MINING AND GEOLOGICAL CONDITIONS
2010
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Repairing a tunnel lining under difficult conditions
Engineering Index Backfile | 1915
Scientific Periodicals of Ukraine | 2010
|British Library Online Contents | 2001
|Online Contents | 1993