Developing Y-shaped lines in China is helpful to solve the problems of low coverage and low utilization rate of rail transit lines in suburban areas. At present, most scholars consider the departure frequency and the choice of subway routing node separately to discuss and study, lack of research on combination effect. This paper combines the departure frequency and metro routing nodes to analyze the operation index changes of Y-shaped line. And Y-shaped line of Guangzhou city as the basic data. Departure frequency and train routing nodes are combined to analyze the operation index changes of Y-shaped line. The calculation results show that the combination of the two is helpful to improve the passenger waiting time and train running kilometers under different routing conditions. The collaborative optimization between them is realized.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Analysis on the Effect of Y-Shaped Line Opening Scheme: A Case Study of Guangzhou City


    Beteiligte:
    Wang, Yue (Autor:in) / Li, Wenquan (Autor:in) / Zhang, Yao (Autor:in)

    Kongress:

    21st COTA International Conference of Transportation Professionals ; 2021 ; Xi’an, China


    Erschienen in:

    CICTP 2021 ; 777-787


    Erscheinungsdatum :

    14.12.2021




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Guangzhou opening date

    Online Contents | 1998


    Guangzhou Case Study

    Springer Verlag | 2007


    The Transportation Improvement Scheme of Liuhua District in Guangzhou City

    Yin, H. / Xu, J. / Wong, S. C. et al. | British Library Conference Proceedings | 2000


    The Transportation Improvement Scheme of Liuhua District in Guangzhou City

    Yin, Hongbin / Xu, Jianmin / Wong, S. C. | ASCE | 2000