On the basis of the inspection of 10 modernized marshalling yards that were performed modernization reconstruction during recent years, this article analyzes the safe coupling rates of cars and the errors of retarder's speed control systems. The article also summarizes the operation effectiveness of modernization reconstruction, problems unresolved. Finally, suggestions for further improvements are given.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Analysis of Hump Automation in China


    Beteiligte:
    Zhang, Chao (Autor:in) / Wei, Yu (Autor:in) / Xiao, Guiping (Autor:in) / Wang, Zhigao (Autor:in) / Fu, Jingyang (Autor:in)

    Kongress:

    Second International Conference on Transportation and Traffic Studies (ICTTS ) ; 2000 ; Beijing, China



    Erscheinungsdatum :

    2000-07-12




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Analysis of Hump Automation in China

    Zhang, C. / Wei, Y. / Xiao, G. et al. | British Library Conference Proceedings | 2000



    Hump automation experience in Basle-Muttenz II marshalling yard

    Konig, H. / Palm, E. / Stalder, O. | Tema Archiv | 1976


    Over the Hump

    W. H. Tunner | NTIS | 1998


    Getting the hump

    Cropley, Steve | Online Contents | 2004