Since SBB opened its first fully automated marshalling yard in November 1975 a number of problems have come to light. The release speed of both clasp and eddy-current retarders has proved slower than expected and compensation is necessary in the case of light axles, but the authors consider that the 2*DELTV algorithm used for spacing cuts is nevertheless sound in principle. The BMII yard is peculiar in that wagons are run out of the reception sidings and over the hump by gravity.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Hump automation experience in Basle-Muttenz II marshalling yard


    Weitere Titelangaben:

    Erfahrungen mit der Ablaufberg-Automatisierung im Rangierbahnhof Basel-Muttenz II


    Beteiligte:
    Konig, H. (Autor:in) / Palm, E. (Autor:in) / Stalder, O. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1976


    Format / Umfang :

    6 Seiten, 8 Quellen


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Hump marshalling yard design

    Alexander, N.J.B. | Engineering Index Backfile | 1965




    Automation of Zilina Teplicka Marshalling Yard

    Bahr, Detlef / Bachratý, Jozef | IuD Bahn | 2012


    Carlisle marshalling yard

    Engineering Index Backfile | 1963