Iterative initial value of cable force based on influence matrix and linear programming is determined in order to study the cable force of long-span concrete-filled steel tube (CFST) arch bridge using the cable-hoisting construction method. Considering the effect of tangential displacement, we observed the appropriate cable force through the golden selection method and iterative forward erection. The cable force determination flow and method aimed at the installation shape are analyzed, which shows that the one-off tension of the cable force on a cable-hoisting CFST arch bridge focusing on installation shape is achieved and serves as a reference for similar engineering practices.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Optimum Calculation Method for Cable Force of Concrete-Filled Steel Tube Arch Bridge in Inclined Cable-Stayed Construction


    Beteiligte:
    Li, Yang (Autor:in) / Wang, Jiang-long (Autor:in) / Ge, Su-su (Autor:in)


    Erscheinungsdatum :

    15.02.2017


    Format / Umfang :

    72017-01-01 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt





    Cable Construction and Its Analysis of Concrete-filled in Steel Tubular Arch Bridge

    Liang, C. / Chunsheng, L. / Huijun, W. | British Library Online Contents | 2003


    Cable-stayed bridge deck crane for hoisting large-tonnage cable-stayed bridge steel beam and construction method

    LU GUANNAN / WU RUIHUAN / ZHANG HUAWU et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Analysis of Identified Cable Force of Cable-Stayed Bridge

    Li, Fengchen / Zhang, Lina / Tian, Shizhu et al. | ASCE | 2009