Guangzhou-Shenzhen-Hong Kong High Speed Railway Shiziyang Tunnel is the longest and highest operation speed of the first high-speed railway double line shield tunnel. To ensure the safe operation and further reduce the influence of running high speed railway train on tunnel stratum and structure, vibration damping ballastless track is adopted in Shiziyang Tunnel. The paper has studied the Shiziyang Tunnel structure design, determined the reasonable damping cushion stiffness. In Shiziyang Tunnel commissioning period, ballastless track vibration test is carried out to evaluate the vibration damping effect and the safety and comfort when high-speed train is passing through, to verify the design parameters of vibration damping ballastless track, to provide technical basis for further optimization of high speed railway ballastless track vibration damping design.
Design and Experimental Study on Shiziyang Tunnel Vibration Damping Ballastless Track of Guangzhou-Shenzhen—Hong Kong High Speed Railway
First International Conference on Rail Transportation 2017 ; 2017 ; Chengdu, Sichuan Province, China
ICRT 2017 ; 1055-1064
2018-03-13
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Track for the Guangzhou - Shenzhen - Hong Kong high-speed railway line
IuD Bahn | 2011
|Guangzhou-Shenzhen-Hong Kong passenger-dedicated line project
IuD Bahn | 2006
|Shenzhen & Hong Kong Bi-City Biennale
Online Contents | 2008