101–120 of 365 hits
|

    Improved recovery of conventional natural gas. Part 2: Results of a pilot test

    Papay, J. | Tema Archive | 1999
    Keywords: Bohrung (Bergbau)

    Automated steering systems applied to complex horizontal well in South Italy

    Calderoni, A. / Oppelt, J. / Ligrone, A. et al. | Tema Archive | 1998
    Keywords: Bohrung (Bergbau)

    In situ coal gasification: a unique means of energy recovery

    Schrider, L. / Fischer, D. | Tema Archive | 1976
    Keywords: BOHRUNG (BERGBAU)

    High capacity jet EDM of the small diameter holes in blades of perspective engines

    Karasev, B.E. / Logunov, A.V. / Knivel, M.J. et al. | Tema Archive | 1996
    Keywords: Bohrung (Spanen)

    Rivet bore drilling with industrial robots

    Wulfsberg, J. / Derfling, D. | Tema Archive | 2007
    Keywords: Bohrung (Spanen)

    Development of vibration assessment and screening methods for attachments to pipeline systems

    Wastling, M. / Kroon, M. / Andrews, R. et al. | Tema Archive | 2002
    Keywords: Bohrung (Spanen)

    British yards win welcome oil business

    Booth, D. | Tema Archive | 1975
    Keywords: BOHRUNG

    Montagestrasse fuer Pkw-Hinterachsgetriebe

    Schubert, F. | Tema Archive | 1976
    Keywords: BOHRUNG (SPANEN)

    HDD may not be the answer for all sensitive water crossings

    Reid, S.M. / Anderson, P.G. | Tema Archive | 1998
    Keywords: Bohrung (Bergbau)

    Der neue mittelschnellaufende Dieselmotor M 601 der MaK

    Lembcke, H. | Tema Archive | 1976
    Keywords: BOHRUNG

    Deepwater gas development off Egypt overcomes challenges

    Tema Archive | 2003
    Keywords: Bohrung (Bergbau)

    Lateral buckling of pipe with connectors in curved wellbores

    Mitchell, R.F. | Tema Archive | 2001
    Keywords: Bohrung (Bergbau)

    Tiefbohren im Fahrzeugmotorenbau

    Kluth, R. | Tema Archive | 1977
    Keywords: BOHRUNG

    Dynamic positioning for drilling

    Guyard, H. / Honorat, R.V. | Tema Archive | 1975
    Keywords: BOHRUNG (BOHRLOCH)

    Research of Seabed Rescue Method of Uncontrolled Blowout in Offshore Drilling

    Ren, Mei-Peng / Li, Xiang-Fang / Shi, Fu-Quan et al. | Tema Archive | 2012
    Keywords: Bohrung in Küstennähe

    Operators announce 2004 budgets, drilling plans

    Rach, N.M. | Tema Archive | 2004
    Keywords: Bohrung (Bergbau)

    BP shareholders warned of three difficult years

    Booth, D. | Tema Archive | 1975
    Keywords: BOHRUNG