1–16 of 16 hits
|

    Some examples of arc welded ship construction

    Arnott, D. | Engineering Index Backfile | 1934

    Welding in shipbuilding

    Arnott, D. | Engineering Index Backfile | 1941

    Welding in shipbuilding

    Arnott, D. | Engineering Index Backfile | 1940

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1942

    Welding in shipbuilding

    Arnott, D. | Engineering Index Backfile | 1941

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Welding in shipbuilding

    Arnott, D. | Engineering Index Backfile | 1941

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Some observations on ship welding

    Arnott, D. | Engineering Index Backfile | 1943

    Does man always close the loop in trying to pilot a large ship?

    Arnott, D. R. / Govindaraj, T. | NTRS | 1982

    Void Development in an Epoxy Film Adhesive During Vacuum Bag Cure

    Wilson, A. / Kindermann, M. / Arnott, D. et al. | British Library Conference Proceedings | 1995

    The Influence of Pre-Bond MEX Exposure on Bond Durability

    Olsson-Jacques, C. / Rider, A. / Arnott, D. et al. | British Library Conference Proceedings | 1995

    The Effect on Mechanical Properties of Void Formation During Vacuum Bag Processing of Epoxy Film Adhesives

    Arnott, D. / Pearce, P. / Wilson, A. et al. | British Library Conference Proceedings | 1995