Improvement of Flexibility by Production Ordering Interval in Make-to-Stock Environment
Route Guidance with Unspecified Staging Posts Using Genetic Algorithm for Car Navigation Systems
Job-shop Scheduling Based on the Similarity of Job Flow Pattern
Development of a high powered, economical four-valve engine, Toyota 4A-GE
Visualization Study of the Local Flow Field in an Orifice and Double-Inlet Pulse Tube Refrigerator
Development of a high powered, economical four-valve engine, Toyota 4A-GE