Rail and metro lines are powered by traction power substations (TPSSs) located within an appropriate proximity in order to ensure the best power performance and safety for the transportation system. It is preferable to locate the substations at the actual existing primary grid stations with a provision for adequately protected railway connection lines. The chapter summarizes the main criteria for establishing a grid connection strategy. If the primary power supply of a transformer and conversion substation is organized for cascaded connection (in‐out), then there should be a provision for interconnecting power line sections supported on separate pole structures. Voltage transformers (VTs) and current transformers (CTs), besides providing voltage and current measurements to the input lines, are necessary for giving various indications and status recordings as also required for metering purposes. The state‐of‐the‐art method is to proceed with the rating of the TPSS according to the last of the newly exposed methods. The chapter examines these methods more detail.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    DC Railway Electrification Systems



    Publication date :

    2018-02-12


    Size :

    78 pages




    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    Railway electrification

    Engineering Index Backfile | 1931


    Railway electrification

    Gibbs, G. | Engineering Index Backfile | 1929


    Railway electrification

    Engineering Index Backfile | 1928


    Railway electrification

    Agnew, W.A. | Engineering Index Backfile | 1931


    Railway electrification

    Smith, R.T. | Engineering Index Backfile | 1930