With a sustained growth of cars, many urban traffic problems caused by cars should be solved as soon as possible. However, basic urban traffic investigation and analysis of current situation is the the basis and the key to solve the problems. In this paper, investigation of traffic volume and pot speed is done at DongYing Road in Hohhot, and basic data base is established. Some significant parameters of urban traffic are calculated, and current traffic situation of the investigated road is detailedly analysed and studied. What is more, some problems found during the investigation are proposed and corresponding feasible suggestions are given.
Research on the Urban Traffic Flow and Traffic Problems in Hohhot
Applied Mechanics and Materials ; 587-589 ; 2053-2056
2014-07-04
4 pages
Article (Journal)
Electronic Resource
English
Discussion on the Future Building of Urban Rail Traffic Network of Hohhot
Trans Tech Publications | 2012
|Discussion on the Future Building of Urban Rail Traffic Network of Hohhot
Tema Archive | 2012
|Analysis of the Traffic Parameters Based on Traffic Investigation in the Hohhot
Trans Tech Publications | 2014
|Research on Building Integrated Urban Rail Transport System Model of the Hohhot
Trans Tech Publications | 2014
|Research on Traffic Flow Characteristics of Urban Expressway
Trans Tech Publications | 2014
|