In the massive activities of cities, rush hour is temporary while hot roads are congested seriously. Traffic flows are unbalanced severely in two aspects of time and space. Traffic control program is key point while few researches put emphasis upon it. In this paper, a bi-level programming model to make traffic control measure is brought forward. In upper level, providing key member with high transportation service is first thought over, and then the sum of travel delay of the masses and cost of traffic control is minimized. In lower level, evacuation delay of activities personnel is designed to ensure no traffic jam emerged. Rough set genetic algorithm is employed to solving bi-level programming problem in the paper, and an example of traffic control to massive activity verifies the validity of the proposed model.
Study on Bi-Level Programming Model for Traffic Control on Massive Activities
Applied Mechanics and Materials ; 44-47 ; 3927-3931
2010-12-06
5 pages
Article (Journal)
Electronic Resource
English
Bi-Level Programming Model of Urban Traffic Network Considering Noise Pollution Control
British Library Conference Proceedings | 2009
|Comprehensive Pricing Model of Urban Traffic Air Pollution Based on Bi-Level Programming
British Library Conference Proceedings | 2013
|Comprehensive Pricing Model of Urban Traffic Air Pollution Based on Bi-Level Programming
Tema Archive | 2012
|Comprehensive Pricing Model of Urban Traffic Air Pollution Based on Bi-Level Programming
Trans Tech Publications | 2012
|