In the UK, it is a legal requirement for a safety case to be produced for each offshore installation. A safety case involves a process called formal safety assessment in which all hazards and risk to personnel on the platform are identified and quantified. The operator or designer of the installation is required to demonstrate that the risk to personnel is below a level which is deemed to be acceptable, and in any case, reduced to a level which is ALARP (as low as reasonably practicable). In any existing facility, any risk reduction measures can be judged to be reasonably practicable by balancing the cost of implementing the measure and the benefit in terms of risk reduction set against the current risk level of the facility. In the design of new facilities, there is no pre-existing baseline risk level. The demonstration of the application of ALARP is through the process design. The work undertaken during the design of the BP Andrew platform is described to assess and reduce the risk of TR (temporary refuge) impairment due to gas explosion and smoke and gas ingress. The process of platform design and risk analysis was integrated in the Andrew Project; safety technologists at BP using state-of-the-art quantification methods were part of the design team at Brown & Root. This allows the Project to identify practical changes in their design which could reduce risk significantly without incurring cost or schedule penalties. The project was able to identify design changes which reduce both the risk of TR impairment and cost of the facility. Two examples are included to demonstrate how the principle of ALARP was achieved by two different routes: a) the platform was designed against a worst-case event, thus achieving the lowest possible risk, and b) the risk of TR impairment of available practicable design options was accurately quantified and understood and the design option with the lowest risk was chosen. The project was able to demonstrate a final TR impairment of less than 4x10-5 per year at the end of the design.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Application of ALARP to the design of the BP Andrew platform against smoke and gas ingress and gas explosion


    Additional title:

    Anwendung von ALARP für die Konstruktion der BP-Andrew-Plattform zur Verhinderung der Akkumulation von Gaswolken und von Gasexplosionen


    Contributors:
    Tam, V. (author) / Moros, T. (author) / Webb, S. (author) / Allinson, J. (author) / Lee, R. (author) / Bilimoria, E. (author)


    Publication date :

    1996


    Size :

    6 Seiten, 3 Bilder, 8 Quellen




    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Design safety strategy and ALARP - an operator's experience

    Fitzpatrick, M. R. | British Library Conference Proceedings | 1995


    The application of ALARP in the railway industry

    Edge, D. J. / Institution of Mechanical Engineers / Institution of Civil Engineers | British Library Conference Proceedings | 2001


    Elevator with smoke ingress prevention module

    CHOI KWANG IL | European Patent Office | 2023

    Free access

    Elevator with smoke ingress prevention module

    European Patent Office | 2023

    Free access

    SAFETY - The GAME, MEM and ALARP principles of safety

    Trung, Bao Le | Online Contents | 2000