The Swedish Transport Administration (in Swedish, Trafikverket) needed to establish a good approach on the methodology to describe the functionality and also the demands for the operation and control of the tunnel ventilation in a new and complex road tunnel. Therefore, in the Call for Tender the technical description of the tunnel-ventilation control had to be in such a format that it could be used as a software application for the system integrator. There are some difficulties you had to be aware of in this kind of contracts. The main contractor for installations in a traffic tunnel had to handle approx. 10 different technical systems. Can we really expect the contractor to be an expert or find experts on everything, especially when this tunnel project is so particular?


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Control of the tunnel-ventilation system in the northern link (Norra Länken) in Stockholm


    Contributors:


    Publication date :

    2014


    Size :

    6 Seiten, Bilder



    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Blå-gult på norra Jylland

    Timoleon, Tim | IuD Bahn | 2005


    Stockholm-Arlanda rail link

    Online Contents | 1995



    Submerged tunnel ventilation shaft and submerged tunnel ventilation system

    LIU SHENG | European Patent Office | 2020

    Free access