The Three Gorges Ship Lift project is characterized by a long construction period, an amount of construction tenders, a plenty of construction teams, a multiplex levels of practitioners, much overhead work, a broad range of construction equipment, risky interference among construction operations, and simultaneous construction at different levels and/or sides, which come into grade cross operations and bring a great deal of difficulties to safety management. As a starting point by grade cross operations in Three Gorges Ship Lift, this research is as follows: 1. Analysis of the processes in operating unit; 2. Risk identification to the Falling Accidents, Objects Strike and Collapse in according to the standards of accident classification; 3. Assessment to rank of hazard on the basis of the result that the risk identification; 4. Put forward the effective measures which reduce hazard in reference to appraise concrete clauses involved. Finally, this paper will give a example as embedded parts and make risk assessment more scientific through comparing with calculating.
Research on Hazard Identification and Assessment of Grade Cross Operations in Three Gorges Ship Lift
2013
5 Seiten
Conference paper
English
Roll-on roll-off ship suitable for scale requirement of Yangtze River three gorges ship lift
European Patent Office | 2021
|Modeling the ship traffic in the Three Gorges area
IEEE | 2015
|Hazard identification. Hazard and risk assessment for a ship when surviving
British Library Conference Proceedings | 1999
|Model Tests for Shallow-Water Ship Maneuverability in Three Gorges Reservoir
Online Contents | 2015
|