In view of the existing shortcomings of the analysis methods for the production system of conventional condensate gas well, the new method that adopts the non-steady gas reservoir seepage and the wellbore coupling has been proposed in this paper, in other words, the gas nozzle control, the wellbore flow and the reservoir seepage have been considered as the coupling entirety; the traditional nodal analysis has been combined with the well test analysis of non-steady seepage; the new production system analysis methods have been employed to discuss the characteristics of gas reservoir seepage, wellbore flow and gas reservoir boundary; at the same time, the changing trends of indicators in the development process have been also analyzed. Afterwards, the coordination state and the changes of parameters of the production system can be predicted in different production methods and different times. And the better results can be obtained through the application evaluation of YK1.
The New Methods for Non-Steady Productivity Prediction of Condensate Gas Reservoir and the Application Evaluation
2012
4 Seiten
Conference paper
English
New comprehensive steady-state mechanical model for gas/condensate pipelines
Tema Archive | 1997
|Productivity Prediction of Horizontal Well with Sulfur Deposition in Sour Gas Reservoir
Tema Archive | 2012
|Water Production Performance and its Control of the Ya-Da Condensate Gas Reservoir
Tema Archive | 2012
|HVAC condenser condensate deflector that deflects and channels the HVAC condensate
European Patent Office | 2018
|