In this paper, the indexes have been determined for identifying ineffective injection production circulation and corresponding mathematical model was constructed with fuzzy theory. Application examples show that this method is simple, fast and accurate. For high and superhigh water cut oilfields, because of the long-term erosion of injected water, there are some high penetrative channels between the injection and production wells, resulting in most injected water along the channel to cause the invalid injection and production, for which it is hard to increase water flooding swept volume, causing flooding and high water cut well and reducing oil production. To improve the effectiveness of water injection to achieve stable yields, it is important to take the measures of ineffective injection-production wells profile control, plugging and so on for fast and accurate identifying ineffective injection-production wells. To that end, this paper applied fuzzy theory to establishing the mathematical model for identifying ineffective injection-production wells.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A Fuzzy Method to Judge Water Passages with Ineffective Injection-Production for Heterogeneous Sandstone Reservoir


    Contributors:


    Publication date :

    2012


    Size :

    4 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Mechanical Analyze of Casing Failure with Sand Production in Loose Sandstone Reservoir

    Zhai, Xiao-Peng / Lou, Yi-Shan / He, Bao-Sheng et al. | Tema Archive | 2012



    Possible Reasons of Ineffective CTB

    Zlnayova, L. | British Library Conference Proceedings | 2001


    Study on Borehole Stability of Unconsolidated Sandstone in Depleted Reservoir

    Tan, Qiang / Deng, Jin-Gen / Yu, Bao-Hua | Tema Archive | 2012