The main mode of pile-soil interaction and the influence factors of pile sinking in offshore platform construction were analyzed and discusses the reasons that penetration resistance increases after stop driving and then continue. To study the drivability of piles of specified driving hammer, taking a jacket platform of Bohai Sea for instance, the results showed that continuous driving will make the open-end steel piles be driven to the designed depth, and driven-on will cause soil plug and pile driving refusal. Based on the results, the paper gives some suggestions about pile driving.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Study on Pile-Soil Interaction during Pile Sinking and Drivability of Pile in Offshore Platform


    Contributors:


    Publication date :

    2012


    Size :

    5 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Pile sinking method for offshore wind power pile foundation

    XU YANDONG / YANG HELIN / LIU MING et al. | European Patent Office | 2023

    Free access

    Pile sinking device and amphibious pile planting machine

    GAO XIONGJIE / ZHANG YAN / WEI YUPING et al. | European Patent Office | 2024

    Free access

    Novel workboat suitable for single pile foundation pile sinking and construction method

    LING JIANAN / LUO WEN / TANG XUAN et al. | European Patent Office | 2023

    Free access

    Pile machine for offshore wind power floating type pile stabilizing platform construction

    MENG XUN / WU SHANG / XU JIANGTONG et al. | European Patent Office | 2023

    Free access

    Offshore pile driving barge

    GU YONG / DONG JIANGPING / WANG LIHUA et al. | European Patent Office | 2024

    Free access