Developing deepwater oil and gas resource is the trend of oil industry development. It is important to select a proper development scenario and riser system which works as a key tool to connect subsea equipment and surface body in a deepwater project. Based on the West Africa’s deepwater target field CNOOC owned, this paper designs a detailed development scenario-FPSO +SPS +Shuttle tanker according to the following factors: well, reservoir layout, environment, floaters availability, commercial considerations. Floater and riser selection interact with each other. Considering the development scenario, a basic method for selecting a proper riser system is presented. As a result, FSHR is selected from existing risers based on technology, reliability, risk and cost.
Development Scenario and Riser Selection for West Africa’s Target Oil Field
FAMET, International Conference on Frontiers of Advanced Materials and Engineering Technology, 2012 ; 1773-1776
Advanced Materials Research ; 430-432
2012
4 Seiten
Conference paper
English
Tema Archive | 2000
|GETMA - West Africa's alternative societe
British Library Online Contents | 1999
Bridging the Capacity Gaps to meet West Africa’s Security Challenges
DeGruyter | 2013
|Orion Parachute Riser Cutter Development
AIAA | 2011
|