In September 1999, Alstom Automation initiated a project known as Subsea Power Electrical Equipment Demonstrator 2 (SPEED 2). The objective of SPEED 2 is to develop a transmission, distribution and control system capable of operating at depths of up to 3000m.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    High power connections


    Published in:

    Publication date :

    2000


    Size :

    2 Seiten



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English






    Low-loss adhesive-free fiber connections for high-power laser transmission

    Lee, H.-C. / Meissner, H. E. / Meissner, O. R. et al. | British Library Conference Proceedings | 2003


    Connections

    Watts, P H | SAGE Publications | 1994


    Connections

    Watts, P.H. | Online Contents | 1994