Complete information is required before the design of the station can be implemented. This information consists primarily of hourly flows and pressure data. Insuffieicent information is usually the cause of poorly designed stations. Contracts furnish much of the pertinent information such as base pressure and temperature, assumed atmospheric pressure, maximum delivery pressure, price of gas and length of contract; but the remaining information must be acquired by direct contact with the customer. The use of a form listing all the required data with the space for inserting information is recommended. The form should include space for indicating meters, regulators, and other equipment actually selected for the installation.
Design of distribution metering and regulation stations
Auslegung von Mess- und Regelstationen fuer die Gasversorgung
1983
3 Seiten, 1 Bild
Conference paper
English
New metering stations to appear at IFAT event
Online Contents | 2014
Gasunie selects turbine meters for renovated expert metering stations
Tema Archive | 1990
|Systems and methods for verifying sub metering accuracy for electric vehicle charging stations
European Patent Office | 2019
|SYSTEMS AND METHODS FOR VERIFYING SUB METERING ACCURACY FOR ELECTRIC VEHICLE CHARGING STATIONS
European Patent Office | 2019
|Systems and Methods for Verifying Sub Metering Accuracy for Electric Vehicle Charging Stations
European Patent Office | 2018
|