M.R. Bonds;N.H. Borton;J.H. Kuruber: Route engineering and installation of subversible plant for submarine telecommunication systems (25-30). --R.O.L. Histed: Construction of submarine cable terminal in a remote area Currimao, Ilocos Norte, Philippines (31-34). --F.E. Kirkland;K.M.McDonald: An automated approach to transmission data acquisition during the laying and line-up of submarine cable systems (35-40). --J. Genoux: Automatic monitoring and maintenance of submarine link (41-47). --J.E.H. Cosier;P.D. Jenkins: Development of equipment for the recovery and repair of submarine cables (grapnels and release hooks) (48-51). --R.A. George: The maintenance of the submersible plant used on submarine telecommunications systems (52-55).
Submarine telecommunications systems, int. Conf.; Febr. 26-29, 1980, London, GB (Part 2)
Unterwasser-Fernmeldesysteme, int. Konf.; 26.-29. Feb. 1980, London, GB (Teil2)
1979
31 Seiten
Conference paper
English
PLANUNG , KABELVERLEGUNG , UNTERWASSERKABEL , FERNSPRECHKABEL , UNTERWASSERNACHRICHTENTECHNIK , SEEKABEL , ZUVERLAESSIGKEIT , AUTOMATISCHES SYSTEM , LEBENSDAUER , LINIENFUEHRUNG , MESSVERFAHREN , PRUEFAUTOMAT , KOSTEN , DATENVERARBEITUNG , WARTUNG , KABELUEBERWACHUNG , RELAISSTATION , MINIRECHNER , REPARATUR , UNTERWASSERTECHNIK , KABELSCHIFF