Abstract Collapse or breakage of a bridge generally causes considerable damage and social loss to the users. Therefore, it is critical to maintain a certain level of bridge performance. In addition, regular maintenance work should be performed for key bridges and countermeasures should be rapidly taken if a bridge is found to have a problem. As many of the bridges in South Korea have been publicly used for many years and are aged, the maintenance cost is expected to increase significantly. The government and relevant administrative authorities need a method to efficiently distribute limited budgetary resources and reasonably determine the maintenance priorities. The present study developed a risk-based maintenance prioritization methodology by identifying 14 general risk factors causing damage to bridges and the assessment criteria and weight for the risk factors were determined by conducting a literature review and expert consultation. A general-purpose risk-based prioritization model is presented using an Excel sheet to support user convenience. The model of the present study was developed to compensate the conventional maintenance prioritization method used by management authorities. The present model may be used for more reasonable bridge maintenance prioritization in combination with the conventional method.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Development of Risk-Based Bridge Maintenance Prioritization Methodology


    Contributors:
    Kim, Dongjin (author) / Lee, Yongjun (author) / Lee, Min-jae (author)

    Published in:

    Publication date :

    2018




    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English



    Classification :

    BKL:    55.80 Verkehrswesen, Transportwesen: Allgemeines, Verkehrswesen, Transportwesen: Allgemeines / 74.75 Verkehrsplanung, Verkehrspolitik, Verkehrsplanung, Verkehrspolitik / 55.80 Verkehrswesen, Transportwesen: Allgemeines / 56.24 Straßenbau, Straßenbau / 56.24 Straßenbau / 74.75 Verkehrsplanung, Verkehrspolitik



    Development of Risk-Based Bridge Maintenance Prioritization Methodology

    Kim, Dongjin / Lee, Yongjun / Lee, Min-jae | Springer Verlag | 2018


    GIS-Based Bridge Scour Prioritization

    Ho, Carlton L. / Di Stasi, Jeffrey M. / Rees, Paula | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2002

    Free access

    Kwajalein Infrastructure Prioritization Methodology

    H. Jockheck / K. Ryan / B. Siekman et al. | NTIS | 2012


    Prioritization Methodology for Chemical Replacement

    W. Cruit / S. Schutzenhofer / B. Goldberg et al. | NTIS | 1993


    Prioritization Methodology for Chemical Replacement

    Goldberg, B. / Cruit, W. / Advisory Group for Aerospace Research and Development; Propulsion and Energetics Panel | British Library Conference Proceedings | 1995