This paper will provide preliminary plans for mission design and navigation during the last two weeks of the orbit phase, where several close passes to the surface will be incorporated to enhance the science return.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Preliminary Planning for Near's Low-Altitude Operations at 433 Eros


    Contributors:
    Heyler, G. (author) / Santo, A. (author) / McAdams, J. (author) / Farquhar, R. (author) / Dunham, D. (author) / Scheeres, D. (author) / Giorgini, J. (author) / Yeomans, D. (author) / Williams, B. (author) / Owen, W. (author)

    Publication date :

    1999-08-16


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    Preliminary Planning for Near's Low-Altitude Operations at 433 EROS (AAS 99-465)

    Antreasian, P. G. / Helfrich, C. E. / Miller, J. K. et al. | British Library Conference Proceedings | 2000


    Preliminary considerations for NEAR's low-altitude passes and landing operations at 433 Eros

    Antreasian, P. / Helfrich, C. / Miller, J. et al. | AIAA | 1998


    Preliminary Planning for NEAR's Low-Altitude Operations at 433 Eros

    P. G. Antreasian / C. L. Helfrich / J. K. Miller et al. | NTIS | 1999


    Preliminary Planning for NEAR's Low-Altitude Operations at 433 Eros

    Antreasian, P. G. / Helfrich, C. L. / Miller, J. K. et al. | NTRS | 1999


    NEAR Shoemaker's low altitude operations at Eros

    Antreasian, P. G. / Chesley, S. R. / Helfrich, C. E. et al. | NTRS | 2001