This paper will provide preliminary plans for mission design and navigation during the last two weeks of the orbit phase, where several close passes to the surface will be incorporated to enhance the science return.
Preliminary Planning for Near's Low-Altitude Operations at 433 Eros
1999-08-16
Miscellaneous
No indication
English
Preliminary Planning for Near's Low-Altitude Operations at 433 EROS (AAS 99-465)
British Library Conference Proceedings | 2000
|NEAR Shoemaker's low altitude operations at Eros
NTRS | 2001
|