This paper summarizes the resolution of an in flight anomaly that occurred during the deployment of the first of three MARSIS antenna booms. Characteristics of this deployment are described, along with a correlation to finite element models and measured spacecraft inertias, which allowed the intermediate state of the boom to be accurately determined. Based on this information, a spacecraft maneuver was performed that warmed the stalled hinge and led to the first boom successfully locking into its designed geometry. The confirmed partially deployed boom shape was then used to develop a thermal model of the stalled hinge both in its initial solar attitude and during the successful spacecraft maneuver. Results from the hinge thermal model and component level testing were evaluated in order to determine the root cause of the anomaly and the probability of its recurrence on subsequent deployments. These conclusions were then utilized in planning mitigating actions that were implemented during the remaining two boom deployments. Final flight data are presented for both dipole booms indicating a correctly deployed and healthy antenna. The monopole boom deployment was detected but the final state of the boom is unknown.
MARSIS antenna flight deployment anomaly and resolution
47th AIAA Structures, Structural, and Materials Conference ; 2006 ; Newport RI, United States
2006-05-01
Conference paper
No indication
English
MARSIS Antenna Flight Deployment Anomaly and Resolution
AIAA | 2006
|AIAA-2006-1684 MARSIS Antenna Flight Deployment Anomaly and Resolution
British Library Conference Proceedings | 2006
|MARSIS antenna deployment testing and analysis
NTRS | 2005
|AIAA-2006-1683 Analysis of the Lenticular Jointed MARSIS Antenna Deployment
British Library Conference Proceedings | 2006
|