Frederick Sturckow discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.
STS-88 Crew Interview: Frederick "Rick" Sturckow
1998-12-17
Audio-visual
No indication
English
STS-105 Crew Interview: Rick Sturckow
NTRS | 2001
STS-96 Crew Interview: Rick Husband
NTRS | 1999
General Motors - Interview mit Präsident Rick Wagoner
Online Contents | 2000
WIRTSCHAFT - Im Profil - Interview mit GM-Chef Rick Wagoner
Online Contents | 2008