Postlaunch operations scheduled in connection with the October 5, 1990, launch of Space Shuttle Discovery with the Ulysses payload are detailed. A summary is presented of postlaunch events up to and including the separation of Ulysses from Discovery, providing a timeline for the upper-stage burn and spacecraft separation. A timeline is also provided for the payload switch-on. Initial in-orbit and routine operations are discussed and missions-operations organization, the data ground segment, and Ulysses data production are considered.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Post-launch operations and data production


    Contributors:
    Beech, P. (author) / Meyer, D. (author)

    Published in:

    Publication date :

    1990-08-01



    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English




    RainCube and Its Initial Post-Launch Operations

    Williams, Austin / Chahat, Nacer / Sander, Jonathan et al. | NTRS | 2018


    Launch Operations

    Waterman, Robert D. / Nicoli, Patricia E. / Zide, Alan J. et al. | Wiley | 2011


    National Launch System Launch Operations

    British Library Conference Proceedings | 1992


    Launch operations

    Hahn, A. C. / Michalson, G. M. / Ziemianski, J. A. | NTRS | 1969


    Launch Vehicles and Launch Operations

    Wernher Von Braun | NTRS | 1962