Contract effort can be grouped under programs concerned with telemetry system studies, rocket and balloon instrumentation systems, orbiting vehicles, field support for certain sounding rockets and balloons, and evaluation of commercial telemetry system components. The telemetry system studies are concerned with signal-to-noise improvement in frequency division multiplex systems and deal with subcarrier pre-emphasis tapers, computer analysis of FM/FM spectrums and extension of system threshold. The orbital vehicle effort is concerned with the solar panels and a magnetic tape recorder for the Cannonball II satellite as well as the solar power analysis of an additional vehicle. The field support rendered in connection with the various programs is tabulated. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Signal Improvement Studies and Instrumentation Systems for Space Vehicles


    Contributors:

    Publication date :

    1971


    Size :

    103 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Data Transmission and Instrumentation Systems for Space Vehicles

    J. S. Rochefort / L. J. O'Connor / R. Sukys et al. | NTIS | 1967


    Precision instrumentation radar for tracking space vehicles

    Venkataraman, K. / Institution of Engineers, Australia; National Committee on Space Engineering | British Library Conference Proceedings | 1993


    Space applications instrumentation systems

    Minzner, R. A. / Oberholtzer, J. D. | NTRS | 1972


    Space and related biological and instrumentation studies

    Gibson, R. J. / Goodman, R. M. | NTRS | 1971


    Integrated Circuit Instrumentation for Vehicles

    Goss,A.P. / Smith Industries.GB | Automotive engineering | 1976