Large wind power plants have parts of considerable weight which must be assembled 80-100 m above ground. If the power plant parts are kept at a maximum weight of about 13 tons, helicopters can be used for the installation. In this report suggestions are given on the use of the helicopter and a cost comparison is given between helicopter installation and traditional installation. (ERA citation 10:048441)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Installation of Wind Power Plants Using Helicopters


    Contributors:
    B. A. Olsson (author) / A. Helmner (author)

    Publication date :

    1981


    Size :

    39 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Turbo shaft engine installation problems in helicopters

    Yost, J.H. | Engineering Index Backfile | 1964


    Power for helicopters

    Engineering Index Backfile | 1949


    Power for helicopters

    Engineering Index Backfile | 1949


    Theory and practice of gas turbine power plants for helicopters

    Bensen, I.B. | Engineering Index Backfile | 1953


    Rocket power for helicopters

    Bergaust, E. | Engineering Index Backfile | 1955