To protect U.S. airspace, DOD performs the Aerospace Control Alert mission, which includes military forces arrayed in a rapid response posture to conduct both air sovereignty and air defense operations against airborne threats over the United States and Canada. The National Defense Authorization Act for Fiscal Year 2013 required that the Secretary of Defense submit a report to Congress that provides a cost-benefit analysis and risk-based assessment of the Aerospace Control Alert mission as it relates to expected future changes to the budget and force structure of the mission. The act also requires that GAO review DOD's report and submit any findings to the congressional defense committees. In response to this mandate, GAO examined (1) DOD's April 2013 reporting of a risk-based assessment and cost-benefit analysis of the Aerospace Control Alert mission as they relate to expected future changes to the budget and force structure of that mission and (2) the extent to which DOD has reported the total cost of the Aerospace Control Alert mission. GAO reviewed DOD's April 2013 report to Congress and Aerospace Control Alert budget justification displays, and interviewed knowledgeable DOD officials.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Homeland Defense: Action Needed to Improve Cost Reporting for DOD's Aerospace Control Alert Mission


    Publication date :

    2013


    Size :

    17 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English