Mission integration is an iterative process by which a specific mission is formulated, refined, planned, and executed within the established vehicle(s), architecture, and ground systems design. Mission integration includes the people, vehicle(s) and ground hardware/software, products, processes, analyses, schedules, facilities, Certification of Flight Readiness, etc. The Artemis Mission Integration Task Team (MITT) developed a series of products and processes to support the complex mission integration across various Programs within the Artemis Mission Campaign (Orion, Space Launch Systems, Exploration Ground Systems, Gateway, Human Landing System, and Extravehicular Activity and Human Surface Mobility). The Moon to Mars (M2M) Program is referred to as ‘the enterprise’ as it includes both the M2M organization and the Programs supporting the Artemis Mission Campaign. Artemis Mission Integration has five phases: mission capability, mission definition, mission preparation, mission execution, and post-mission assessment. This paper focuses on one of the enterprise-level mission checkpoints as a kick-off to the Mission Preparation phase, the Mission Integration Review (MIR), which occurs 18-24 months prior to launch. The MIR helps to confirm the defined mission technical baseline is within the existing analyzed design envelope. Details are provided on the identification of dependencies, issues, or gaps for mission-specific objectives and requirements, as well as the definition of the analysis, training, mission execution products, facilities, and detailed supporting operations requirements. The MIR was held for both Artemis I and II and this paper aims to share with the aerospace community its value as we prepare for upcoming Artemis Missions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Enterprise Mission Integration for Artemis Lunar Missions


    Contributors:

    Publication date :

    2023


    Size :

    8 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Enterprise Mission Integration for Artemis Lunar Missions

    Plaza, Mary Anne / McCauley-Slack, Alexs / Marshik, Jaime et al. | IEEE | 2024


    Enterprise Mission Integration for Artemis Lunar Missions

    Mary Anne Plaza / Alexs McCauley-Slack / Jaime Marshik et al. | NTRS


    Artemis Lunar Mission Availability & Design

    Nujoud Fahoum Merancy / Michele DiGiuseppe / George C Nelson | NTRS


    ARTEMIS: The First Mission to the Lunar Libration Orbits

    Woodward, Mark / Folta, David / Woodfork, Dennis | NTRS | 2009