A set of construction and assembly tasks required on the lunar surface was developed, different concepts for equipment applicable to the tasks determined, and leading candidate systems identified for future conceptual design. Data on surface construction and assembly equipment systems are necessary to facilitate an integrated review of a complete lunar scenario.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Lunar Surface Construction and Assembly Equipment Study: Lunar Base Systems Study (Lbss) Task 5.3


    Publication date :

    1988


    Size :

    206 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English