The present invention relates to a CTC3.0-based implementation method for route handling of a regional centralized control station. The method is based on a CTC3.0 technology, and includes the following steps: step (1): generating multi-station train and shunting plans according to a multi-station planning terminal, and executing steps (2) and (4) at the same time; step (2): sending the train plan to an autonomous computer to generate a train route sequence, and executing step (3); step (3): sending, by the autonomous computer, the train route sequence to a regional centralized control route handling terminal; step (4): compiling, by the multi-station planning terminal, an automatically generated shunting route sequence in the shunting plan, and executing step (5); and step (5): synchronizing, by a center service, the shunting route sequence to the regional centralized control route handling terminal. Compared with the prior art, the present invention has the advantages of wide applications, safety, convenience, capability of effectively realizing multi-station management of a regional centralized control station, and the like.
CTC3.0-BASED IMPLEMENTATION METHOD FOR ROUTE HANDLING OF REGIONAL CENTRALIZED CONTROL STATION
2022-08-25
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
CTC3.0-based implementation method for route handling of regional centralized control station
European Patent Office | 2024
|CTC 3.0-BASED IMPLEMENTATION METHOD FOR REGIONAL CENTRALIZED CONTROL STATION ROUTE HANDLING
European Patent Office | 2021
|Method for analyzing peak pushing access of CTC3.0 system
European Patent Office | 2023
|European Patent Office | 2023
|Shunting route monitoring method for non-centralized area
European Patent Office | 2020
|