The invention discloses a turnover method of a box culvert structure and a splicing method of a water collecting gallery. The turnover method of the box culvert structure comprises the steps that the side, to be turned over, of the box culvert structure is determined; a plurality of lifting appliances are mounted at the bottom of the first culvert wall; a plurality of lifting appliances are mounted at the top of the second culvert wall; a plurality of lifting appliances are connected to lifting equipment through a plurality of telescopic lifting chains; the lifting chains connected to the first culvert wall are shortened, meanwhile, the lifting chains connected to the second culvert wall are extended, and turning over of the box culvert structure is completed; the assembling method of the water collecting gallery comprises the steps that all the box culvert structures are turned over through the turning-over method; a box culvert structure is hoisted to the end of the water collecting gallery; the next box culvert structure is connected to the previous box culvert structure through the lifting chain; the lifting chain is shortened, the next box culvert structure is made to be close to the previous box culvert structure, and splicing of the next box culvert structure is completed; and repeating the steps to form the water collecting gallery. The construction steps are simple, the construction efficiency is effectively improved, and the safety of constructors is guaranteed.

    本发明公开了一种箱涵结构的翻身方法及集水廊道的拼装方法,箱涵结构的翻身方法包括确定箱涵结构的待翻身侧;在第一涵壁的底部安装多个吊具;在第二涵壁的顶部安装多个吊具;通过多个可伸缩的吊链将多个吊具连接于吊装设备;缩短连接于第一涵壁上的各吊链,同时伸长连接于第二涵壁的各吊链,完成箱涵结构的翻身;集水廊道的拼装方法包括通过上述翻身方法对各箱涵结构进行翻身;将一个箱涵结构吊装至集水廊道的端头;通过吊链将下一个箱涵结构连接于其上一个箱涵结构;缩短吊链,使下一个箱涵结构靠近其上一个箱涵结构,完成下一个箱涵结构的拼装;重复上述步骤以形成集水廊道。本发明施工步骤简单,有效提高施工效率,并保证施工人员的安全。


    Access

    Download


    Export, share and cite



    Title :

    Turnover method of box culvert structure and assembling method of water collecting gallery


    Additional title:

    箱涵结构的翻身方法及集水廊道的拼装方法


    Contributors:
    HAO LONG (author) / HUI JIANWEI (author) / XUE XIAOHONG (author) / LI LONG (author) / LIU SHAOLIANG (author) / ZHANG YUAN (author) / MA XIAOLIANG (author) / WANG YAN (author) / LOU YACHUN (author) / DONG TIANYI (author)

    Publication date :

    2024-04-02


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES / E03B Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser , INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER



    Auxiliary turnover device for vertical prefabricated box culvert

    LEE SANG HOO / KANG IK-SOON / LI LONG et al. | European Patent Office | 2023

    Free access

    Jacking trolley for quickly assembling culvert sections and control method

    ZHU ZHENYE / WANG JIAQING / CHEN WENYIN et al. | European Patent Office | 2021

    Free access

    Oil collecting turnover vehicle

    FENG YIBIN | European Patent Office | 2020

    Free access

    Turnover heavy gearbox assembling trolley

    LI LEI / SUN HUIMIN / CHEN XUEFENG et al. | European Patent Office | 2021

    Free access

    Hanging device applied to overlong culvert construction by segmental precast culvert section method

    MENG MINGHUA / WANG JIN / HAO ZHENHUA et al. | European Patent Office | 2023

    Free access