The invention discloses a glass curtain wall construction structure and a construction method thereof, and relates to the technical field of glass curtain wall construction.The glass curtain wall construction structure comprises a moving trolley, a storage box is fixedly connected to the top of the moving trolley, a plurality of fixing plates are fixedly connected to the interior of the storage box, and bottom plates are slidably connected to the positions, located above the fixing plates, in the storage box; according to the glass curtain wall construction structure and the construction method thereof, by arranging the bottom plate, the bottom groove and the check block, when glass curtain wall glass needs to be taken, the output end of a first servo motor drives a lead screw to rotate, so that a moving block drives the bottom plate to move, and the bottom plate moves towards the outer side of a storage box; the glass curtain wall on the surface of the bottom plate can be conveniently moved to the outer side of the storage box, a worker can conveniently take down the glass curtain wall through a suction cup, meanwhile, the glass curtain wall can be limited through a check block when the moving trolley and the storage box are moved, and the situation that the glass curtain wall falls off from the storage box and is damaged is prevented.

    本发明公开了玻璃幕墙施工结构及其施工方法,涉及玻璃幕墙施工技术领域,包括移动车,所述移动车的顶部固定连接有存储箱,所述存储箱的内部固定连接有若干块固定板,所述存储箱的内部且位于固定板的上方均滑动连接有底板,该玻璃幕墙施工结构及其施工方法,通过设置有底板、底槽与挡块,在需要取用璃幕墙玻璃时,第一伺服电机的输出端带动丝杆转动,使得移动块带动底板移动,使得底板向存储箱的外侧方向移动,以便将底板表面的玻璃幕墙移动至存储箱的外侧,方便工作人员使用吸盘将玻璃幕墙取下,同时通过挡块可以在移动移动车与存储箱时,对玻璃幕墙进行限位,防止玻璃幕墙从存储箱中掉落,造成玻璃幕墙损伤。


    Access

    Download


    Export, share and cite



    Title :

    Glass curtain wall construction structure and construction method thereof


    Additional title:

    玻璃幕墙施工结构及其施工方法


    Contributors:
    XIE ZUOFAN (author) / LI KAI (author) / ZHAO PINZE (author) / WAN XIAOLIN (author) / XIAO RONG (author) / YANG BAOLONG (author) / ZHANG DONGJUN (author) / HUANG ZIYING (author)

    Publication date :

    2024-02-20


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E04G SCAFFOLDING , Baugerüste / B08B Reinigen allgemein , CLEANING IN GENERAL / B62B Von Hand bewegte Fahrzeuge, z.B. Handkarren oder Kinderwagen , HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS / E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS



    Glass curtain wall hoisting construction method and equipment thereof

    FANG HAITAO / YE TING / ZHAO GANGFENG et al. | European Patent Office | 2022

    Free access

    Construction site curtain wall glass transportation device

    ZHAO WEI / YI FUMIN / CHEN WENYU et al. | European Patent Office | 2024

    Free access

    Curtain wall construction method

    LIU XIAOHONG / WU CHENGYUN / CHENG JIAN et al. | European Patent Office | 2023

    Free access


    Curtain wall construction device

    GUO JIANWEI / GONG XIAOYE / GAO XINYAN et al. | European Patent Office | 2023

    Free access