The invention discloses a large container ship chimney block carrying and hoisting method. The method comprises the following steps that 1, triangular plates with structural hoisting holes are weldedand designed to the joints of a left outboard plate, a right outboard plate and a platform plate of a chimney block respectively; 2, a first lifting hook and a second lifting hook of a gantry crane are connected to a lifting row; 3, the lifting hook of the lifting row is connected with the triangular plate of the structural hoisting hole of a port, and a third lifting hook of the gantry crane is connected with the triangular plate of the structural hoisting hole of a starboard; and 4, the gantry crane is started, and the chimney block is horizontally hoisted to a dock to be folded and carriedwith a cabin shed block of a lower portion.
本发明公开了一种大型集装箱船烟囱总段搭载吊装方法,所述方法包括如下步骤:步骤1、在烟囱总段的左、右舷外板与平台板的衔接处分别焊接设计有结构性吊装开孔的三角板;步骤2、将龙门吊的第一吊钩和第二吊钩连接在吊排上;步骤3、将吊排的吊钩与左舷的结构性吊装开孔的三角板相连接,将龙门吊的第三吊钩与右舷的结构性吊装开孔的三角板相连接;步骤4、启动龙门吊,将烟囱总段平吊至船坞与下方机舱棚总段合拢搭载。
Large container ship chimney block carrying and hoisting method
一种大型集装箱船烟囱总段搭载吊装方法
2021-03-12
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Carrying and hoisting method for ultra-large container ship windshield block
European Patent Office | 2023
|Ship chimney and superstructure integral hoisting method
European Patent Office | 2023
|Method for hoisting ultrahigh superstructure block on ultra-large container ship
European Patent Office | 2023
|Method for constructing large chimney section of container ship
European Patent Office | 2021
|