Principal design features of marine main propulsion plant, incorporating closed cycle gas turbine and nitrogen cooled power reactor. From paper before Soc Naval Architects and Mar Engrs. (See also - n 10, 11 Mar 7 1957 p 303-5, Mar 14 p 345-7; Shipbldr and Mar Engine-Bldr v 64 n 588 Apr 1957 p 199-201, folding sheet; Brit Motor Ship v 37 n 442 Mar 1957 p 518-22)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    20,000-S.H.P. Nuclear propulsion plant


    Additional title:

    Shipbldg amp; Shipg Rec


    Contributors:
    Giblon, R.P. (author) / Kurz, G.H. (author)

    Published in:

    Publication date :

    1957


    Size :

    3 pages


    Type of media :

    Report


    Type of material :

    Print


    Language :

    English




    Adding 1075 S.H.P. to Point Ancha

    Gelhaus, H.F. | Engineering Index Backfile | 1932


    Design and lay-out of 22,000 S.H.P. Tanker machinery installation

    Main, J.B. | Engineering Index Backfile | 1961


    Advanced-design motor-ship machinery plant -- 20,000 SHP

    Butler, E.A. / Kaufman, R. / Pedersen, T.V. | Engineering Index Backfile | 1967


    20,000-Ton tanker "andreas"

    Engineering Index Backfile | 1956


    New 20,000 ton tankers

    Norton, H.F. | Engineering Index Backfile | 1920