Particulars regarding two-speed continuous induction system, superimposed on existing d.c. signaling, on 102 miles of double track, Sydney, Neb., to Cheyenne, Wyo.; second division is now under construction. Instructions and rules issued to enginemen as to functions and operation of train control.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Union Pacific completes train control


    Additional title:

    Ry. Signaling


    Published in:

    Publication date :

    1925


    Size :

    7 pages


    Remarks:

    17 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Union pacific installs train control

    Engineering Index Backfile | 1925


    Train control on the Union Pacific

    Engineering Index Backfile | 1926



    Union Pacific plans high-speed streamlined train

    Engineering Index Backfile | 1933