Economic and transportation factors which led to building of new port warehouses; design and construction of 6-story reinforced concrete structure, 211 m. by 38 m., founded on wooden piles; structural details, fire protection and materials-handling equipment; total cost of construction 4,900,000 marks.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New warehouse sheds for general cargo in the seaport of stettin


    Additional title:

    Ein neuer Schuppenspeicher fuer Stueckgut im Seehafen Stettin


    Contributors:
    Fabricius, G. (author) / Schulze, H. (author)

    Published in:

    Publication date :

    1929


    Size :

    8 pages


    Remarks:

    20 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German


    Keywords :


    An Optimal Capacity Planning Model for General Cargo Seaport

    Čedomir Dundović / Zdenka Zenzerović | DOAJ | 2012

    Free access

    New cargo-handling equipment of seaport Dordrecht

    Koppen, W. | Engineering Index Backfile | 1930




    Polizeidienstgebäude, Stettin

    Lehmgrübner, Paul | DataCite | 2020

    Free access