Details are given on soil conditions, drainage, macadam sub-base, and asphalt concrete pavement; airport will have 3000 m long 60 m wide runway, 25.5 m wide parallel taxiway, and five 20 m wide roads connecting runway with taxiway; it will be equipped for ground-to-air telecommunication, as well as with MF and VHF radio beacons and ILS landing system.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Construction of Djuanda airport


    Additional title:

    Construction de l'aerodrome de Djuanda


    Contributors:
    Chevre, M. (author)

    Published in:

    Travaux ; n 378


    Publication date :

    1966


    Size :

    5 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    French


    Keywords :


    Airport construction

    TAKEUCHI ARTHUR S | European Patent Office | 2015

    Free access

    AIRPORT CONSTRUCTION

    TAKEUCHI ARTHUR S | European Patent Office | 2017

    Free access

    Modern airport construction

    Keally, F. | Engineering Index Backfile | 1930