In Lowell, Mass, and on four routes extending out of city, Boston and Maine has installed all new electric switch machines and signals, controlled from one machine, to consolidate control of layouts formerly included in six interlockings and three new remote layouts, as well as train operation by signal indication on 17.40 mi of double track including 10.86 mi of previous centralized traffic control.
Boston and Maine consolidates interlockings and C.T.C.
Ry Signaling
Railway Signaling ; 41 , n 12
1948
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New Haven consolidates three interlockings
Engineering Index Backfile | 1937
C.T.C. Extension on Boston and Maine
Engineering Index Backfile | 1947
Semi-automatic interlockings on Boston elevated
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1943
C.T.C. on complete subdivision
Engineering Index Backfile | 1945
|