A series of methods for planning the use of train locomotives has been developed. However, existing scientific research does not clearly specify how the arrival and departure times of freight trains are determined in train schedules, and locomotives are assigned to trains based on the condition of “Locomotive waits for train”. This article proposes a methodology for determining the average time of stay for train locomotives and trains at the boundaries of train sidings for all scenarios ranging from the condition of “Train waits for locomotive” to “Locomotive waits for train”. The EGM program has been developed and created for calculating the fleet of freight locomotives based on the graphical movement time of trains, and an enhanced method for planning the effective use of train locomotives has been developed based on minimizing the downtime of rolling stock within the boundaries of towing sidings.


    Access

    Download


    Export, share and cite



    Title :

    Development of enhanced method for planning train locomotives ready to operate the next day




    Publication date :

    2023




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    Unknown




    Electric locomotives operate on three different voltages

    Taliaferro, W.R. | Engineering Index Backfile | 1928


    Electric locomotives operate on three different voltages

    Taliaferro, W.R. | Engineering Index Backfile | 1928


    Train tonnage for locomotives

    Engineering Index Backfile | 1899


    Electric locomotives operate on three different voltages

    Taliaferro, W.R. | Engineering Index Backfile | 1928


    Electric freight-train locomotives

    Trautvetter, Karl | Engineering Index Backfile | 1921