With the expanding scale of China's high-speed railway network, the increase of new lines, and the increase of train density, the existing layout, and maintenance capabilities of the EMU operation depot have been difficult to meet the operational needs of the high-speed railway network, so it is necessary to combine the network planning of high-speed railways to optimize the layout of new EMUs in advance. In this paper, the influence of new lines and exiting lines on the layout is analyzed and a multi maintenance spots optimization model for EMU operation and maintenance are built by applying multi-depots vehicle routing problem (MDVRP) with resource constraints. Then, taking the high-speed railway network in a certain area as an example, this paper designs two layout schemes for the operation depot, and finally the recommended layout scheme of EMU for this region is given by calculating and comparing the use of EMU in the short and long term.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Optimized Layout of New EMU Operation Depot Based on Improved MDVRP Model


    Contributors:

    Conference:

    Sixth International Conference on Transportation Engineering ; 2019 ; Chengdu, China


    Published in:

    ICTE 2019 ; 1015-1024


    Publication date :

    2020-01-13




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English





    Layout of modern tram depot

    Hewitt, L.B. | Engineering Index Backfile | 1932


    Layout of modern tram depot

    Engineering Index Backfile | 1931


    Layout-optimized manned lunar vehicle

    QIU BAOGUI / XIAO JIE / ZENG LINGBIN et al. | European Patent Office | 2015

    Free access

    Shunting operation planning system for locomotive depot

    LUO CHANGJIN / DING ZHENGGANG / ZHOU TONG et al. | European Patent Office | 2022

    Free access