This paper provides the engineering benefits of the pavement management system (PMS) applied on the national highways in Korea for the last 20 years. 40% of service life of the pavements was enhanced, and 75% of rehabilitation cost per unit length was reduced. Two types of distress analysis methods based on ViziRoad and image process were evaluated. ViziRoad is easy and convenient to be used for general surveys. The image process approach provided is more reliabl, but is definitely time-consuming. To overcome these limitations, the grid image process method was proposed.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Lessons from 20 Years' Experience of Pavement Management Systems on National Highways in Korea: Focus on Distress Survey


    Contributors:

    Conference:

    Geo-Hubei 2014 International Conference on Sustainable Civil Infrastructure ; 2014 ; Yichang, Hubei, China



    Publication date :

    2014-06-23




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English




    Relationship between Pavement Roughness and Distress Parameters for Indian Highways

    Chandra, S. / Sekhar, C.R. / Bharti, A.K. et al. | British Library Online Contents | 2013



    Relationship between Pavement Roughness and Distress Parameters for Indian Highways

    Chandra, Satish / Sekhar, Chalumuri Ravi / Bharti, Anish Kumar et al. | ASCE | 2012