Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    0106 Research on Four-electrical Railway Project Cost Estimate Based on the WBS Standard Templates


    Contributors:


    Publication date :

    2013


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English



    0106 An Empirical Research of Chinese Airline Industry Determinants of Passenger Load Factor

    Wang, Yun / Ouyang, Hong-bing / Zhang, Zong-cheng | TIBKAT | 2009


    AIAA 2001-0106 DECENTRALIZED ADAPTIVE CLOSE FORMATION CONTROL OF UAV'S

    Singh, S. N. / Zhang, R. / Chandler, P. et al. | British Library Conference Proceedings | 2001


    The Earliest Russian Wind Tunnels (AIAA 2015-0106)

    Gorbushin, Anton | British Library Conference Proceedings | 2015


    2010-01-0106 Evaluation of Suspension Characteristics in Response to Cyclical Vertical Accelerations

    Duran, A. / Carr, L. / Liebbe, R. et al. | British Library Conference Proceedings | 2010


    2011-01-0106 A Study of Occupant Ejection Mitigation in Side Impact Crashes

    Dix, J. / Sagawa, K. / Sahare, L. et al. | British Library Conference Proceedings | 2011