Synonyme wurden verwendet für: BERGBAU
Suche ohne Synonyme: keywords:(TIEFBOHRTECHNIK (BERGBAU))

1–20 von 108 Ergebnissen
|

    Well control team caps underwater blowput. Part 1 - Planning phase

    Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Subsea production system mounted above sea bottom

    Tema Archiv | 1989
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Deepwater technology focusing on production

    McNally, R. | Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU) , FOERDERN (BERGBAU)

    Directional-drilling technique is proposed for installing marine pipelines in arctic areas

    Peebles, E.E. | Tema Archiv | 1984
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU) , VORTRIEBSTECHNIK (BERGBAU)

    Spray-ice islands evaluated for arctic-drilling structures

    Juvkam-Wold, H.C. | Tema Archiv | 1986
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Unexpected field corrosion leads to new monitoring with revised predictibve model

    Comeau, B.D. / Marsden, C.I. | Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Design methods for two-phase pipelines compared, evaluated

    Osman, M.E. / El-Feky, S.A. | Tema Archiv | 1985
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    New pressure-drop, holdup equations agree with field data

    Barnette, J.A. | Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Standardized ROV and diver interfaces will bring surge in subsea capabilities

    Baugh, B.F. | Tema Archiv | 1989
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Fast drilling performance achieved at Alwyn in North Sea

    Foulkes, J. / Simson, U. / Delafon, H. | Tema Archiv | 1989
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Fast-track production project cuts installation time in half

    Vargas, K.J. | Tema Archiv | 1991
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU) , FOERDERN (BERGBAU)

    Single vent-line design selected for diverter system

    Crawley, F.K. / Thorogood, J.L. | Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Research program yields preliminary design method for pipelines in 1000-3000 at of water

    Johns, T.G. / McConnell, D.P. | Tema Archiv | 1984
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Program integrates pressure loss for single and two-phase pipelines

    Awoseyin, R.S. | Tema Archiv | 1986
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Operating factors can reduce drill pipe fatigue on floating vessel

    Zeren, F. | Tema Archiv | 1986
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Well control team caps underwater blowout. Part 2 - Executive Phase

    Tema Archiv | 1987
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Korrosionsbeständige Legierungen für Sauergasquellen

    Barr, K.D. / Barten, G. | Tema Archiv | 1990
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Deepwater designs seek better fatigue life

    Tema Archiv | 1985
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Diverless system connects 20-in. Togi gas line. Subsea connection tool developed for both pull and tie-in operations

    Varvin, K. / Pedersen, K. | Tema Archiv | 1992
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU)

    Innovative projects seek break with convention

    Tema Archiv | 1985
    Schlagwörter: TIEFBOHRTECHNIK (BERGBAU) , FOERDERUNG (BERGBAU)