Meinten Sie:
+keyword:(space transportation And safety)
Assessment of Ramp Times (ART 2) Human-In-The-Loop (HITL) Simulation - Final Results
Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport
Modeling Deicing Operations in Departure Scheduling using Fast Time Simulation
Modeling Deicing Operations in Departure Scheduling Using Fast Time Simulation
Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport
A Tactical Scheduler for Surface Metering Under Minimum Departure Interval Restrictions
Taxi Time Comparison Before and After Surface Metering Using ASPM Data
Tactical Surface Metering Procedures for Charlotte Douglas International Airport
A Data-Driven Analysis of a Tactical Surface Scheduler
A Data-Driven Analysis of a Tactical Surface Scheduler
Optimization of Airport Surface Traffic: A Case-Study of Incheon International Airport
Optimization of Airport Surface Traffic: A Case-Study of Incheon International Airport