Airspace Technology Demonstration 2 (ATD-2) sub-project conducted a human-in-the-loop (HITL) simulation to assess various strategies for Ramp controllers to deliver aircraft to the spot at a specified time. Results show that the rate of compliance with the spot time improved when Ramp controllers first complied with a gate hold advisory for pushing aircraft off the gates. Results also show that Ramp controller workload was lower when they only had to focus on complying with the gate hold advisories.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Assessment of Ramp Times (ART 2) Human-In-The-Loop (HITL) Simulation - Final Results


    Beteiligte:

    Kongress:

    ATD2 Tech Transfer ; 2019 ; Moffett Field, CA, United States


    Erscheinungsdatum :

    2019-03-01


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch




    TSTR HITL Results

    Verma, Savita | NTRS | 2018


    SARDA HITL #6 Simulation: System Performance Analysis (Initial Results)

    Lee, Hanbong / Malik, Waqar Ahmad / Jung, Yoon Chul | NTRS | 2015


    Human-In-The-Loop (HITL) Simulation and Analysis of Optimized Profile Descent (OPD) Operations at Atlanta

    Johnson, C. / Ferrante, J. / Shepley, J. | British Library Conference Proceedings | 2009



    SARDA HITL #6 Simulation: System Performance Analysis

    Hayashi, Miwa / Malik, Waqar / Lee, Hanbong et al. | NTRS | 2015