This chapter contains sections titled:
UAV Component Testing
UAV Sub‐assembly and Sub‐system Testing
Testing Complete UAV
Control Station Testing
Catapult Launch System Tests
Documentation
System Ground Testing
2010-04-16
11 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
UAV sub‐assembly and sub‐system testing , control station testing ‐ parallel with UAV testing , catapult launch system tests ‐ differ in length of ‘throw’ and degree of acceleration , commercial off‐the‐shelf (COTS) components‐ maintaining required quality standards , testing complete UAV ‐ HTOL and VTOL aircraft , system ground testing , documentation ‐ results recorded in Treq and Trep documents , UAV component testing ‐ establishing ultimate strength