This chapter contains sections titled:
Introduction
Basic Launch Vehicle Performance and Operation
Spacecraft Launch Phases and Mission Planning
The Ariane 5 Launch Vehicle
US Crewed Launch Systems
Small Launchers and Reusable Sub‐Orbital Vehicles
Re‐Entry into Earth's Atmosphere
Specific Launch Costs and Reliability
Launch Vehicles
Spacecraft Systems Engineering ; 221-250
12.08.2011
30 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
operational flexibility and reliability ‐ and future launch capability , multi‐staged launch vehicles , Ares 1 man‐rated launcher ‐ and Ares 5 heavy lift launch vehicle , spacecraft launch phases and mission planning , satellite, fitted with apogee boost (or kick) motor (ABM/AKM) , principal launch vehicle alternatives ‐ Ariane 5 and Ares 1 key features , aerodynamic drag and lower accelerations , launch vehicles ‐ principles of launch vehicle design and performance , Ariane 5 launch vehicle ‐ Vulcain cryogenic engine
Reusable Launch Vehicles Outlook - Launch Vehicles Table
Online Contents | 2009
Launch Vehicles and Launch Operations
NTRS | 1962
|AIAA | 1986
|NTRS | 1965
|1 Outlook-Specifications - Reusable Launch Vehicles Outlook - Launch Vehicles Table
Online Contents | 2007